Hi All,I have a question in SQL Jobs. Is job a PARALLEL THREAD or SEQUENTIAL?I mean, I have a job and it should trigger for every 1 minute. Let us suppose it will take 10 minutes of time to perform the actions that we specified inside it. In the mean, whether the Job is triggered or not for the second minute?Thanks in advance.
↧