Hi All,We have PROD and DR configuration with 1 primary 2 sec-replica. ON PROD DC we have Primary -secondary replica with auto commit mode and one secondary replica with asynchronous mode ( data loss) on DR ( remote DC).We are planning for a DR drill and wanted to failover to DR server and check the application connectivity. Please do let me know the steps.
↧